Home    |    Sitemap    |    Chinese Edition          »search 

 

back to list

The First Energy Performance Contracting Project of Sinopec Shanghai Petrochemical Company Limited (SPC) Put into Operation

On July 23, the first energy performance contracting project of SPC – “3# APS/VPS Vacuum Extraction System Modification” was successfully put into operation.

After the project was put into operation, 3# APS/VPS overhead vacuum extraction system will reduce the consumption of steam by about 3 tons per hour, and effectively cut down the production energy consumption of the plants by reducing the emission of sour water and the number of online air-cooling fans.

The project was constructed under exclusive investment by SINOPEC Economic and Technical Research Institute, and the economic benefits generated from the project will be shared by SPC and SINOPEC Economic and Technical Research Institute together.

SPC

© 2018 - SINOPEC SHANGHAI PETROCHEMICAL COMPANY LIMITED - All Rights Reserved    |    Legal Notice